this really doesn't have a lot importance, its more just a curiosity. how long does it take you to churn out an acoustic or electric guitar (or any instrument for that matter). i know there are a countless variables that can effect how long it takes, but I'm just speaking in generalities. especially the guys who build professionally or almost professionally since you're more likely to work straight through on one. anyway like i said I'm just curious.

_________________
~shad peters

http://www.flickr.com/photos/petersinstruments/
http://petersinstruments.blogspot.com/
http://petersinstruments.com/


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 11:12 am 
Offline
Koa
Koa
User avatar

Joined: Thu Jul 13, 2006 6:17 am
Posts: 1937
Location: Evanston, IL
First name: Steve
Last Name: Courtright
Focus: Build
Status: Amateur
The last time I stopped in Brune's shop, he showed me a fabulous flamenco that he built and finished in 7 days!

_________________
"Building guitars looks hard, but it's actually much harder than it looks." Tom Buck


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 11:27 am 
Offline
Koa
Koa

Joined: Tue Feb 24, 2009 9:23 am
Posts: 1372
First name: Corky
Last Name: Long
City: Mount Kisco
State: NY
Country: USA
Focus: Build
Status: Amateur
I guess the only way to truly measure is in total work hours. For the pros and full-time guys, that's pretty easy to do. For us "nights and weekends" amateurs, that's a lot more tricky to figure out.

For me there's a pretty interesting curve that relates to the length of time on one axis, and the number of guitars that preceded it on the other.....

In other words, my first guitar took me five months of nights and weekends, and most of that time was building jigs and redoing errors.

Now (5 guitars) I'm a lot faster, but am still improving jigs and processes.

I think that at about guitar number 10, once I'm closer to figuring out what works for me in terms of repeatable processes, I'll be able to crank one out in, say.....2 1/2 months? If I spend 15 hours a week, that's 150 hours. Sounds about right for an amateur with a lot of manual processes.


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 12:17 pm 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Tue Jan 04, 2005 1:43 am
Posts: 1533
Location: Morral, OH
Hang a clipboard by the light switch and log your time when the lights go on and off in your shop. Concentrate on building only one guitar at a time and you will get an idea how many hours you truly have invested in shop time. I did this early on but putting a rounded off number on your time is all over the place. Every guitar is different, cut-aways add time as do inlay work, sun bursts , slot heads, custom shapes, purfling schemes, sound port details, special finishes, etc... I can crank em out pretty darn quick but my work processes are probably unlike any other builder so my numbers are meaningless.

_________________
tim...
http://www.mcknightguitars.com


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 1:33 pm 
Offline
Koa
Koa
User avatar

Joined: Thu Dec 18, 2008 11:42 am
Posts: 1135
Location: Hudson, MA
First name: Kevin
Last Name: Quine
City: Hudson
State: MA
Country: Usa
Focus: Build
Status: Amateur
Are you counting just construction time or all the re-work time to fix my mistakes?? gaah


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 1:40 pm 
Offline
Koa
Koa
User avatar

Joined: Thu Feb 21, 2008 8:57 pm
Posts: 1982
Location: 8.33±0.35 kpc from Galactic center, 20 light-years above the equatorial in the Sol System
First name: duh
Last Name: Padma
City: Professional Sawdust Maker
Focus: Build
peters instruments wrote:
how long does it take you to churn out an acoustic or electric guitar (or any instrument for that matter).



Well Peter

A coulpe of things...very few of us on this site "churn out or knock off" instruments.

We build them.

Some builders can be very fast.

Is true that there are factrories in the far east that "churn' them out by the hundreds every day in every size shape or colour you can imagine.

Me, I am usualy building up to a halve dozen various instruments at any one time and do not keep track of time. I have found that puting a clock in the workshop lowers quality. Futhermore the only time I know the time is when me at the computer and thats because windows come with a built in clock...even the one on the stove don't work, and frankly me don't care.

However I did take up the 6 day Guitar Challenge from Jesse Burge of Burge Guitar Shop in
Hattiesburg, MS and produced a carved archtop, wishbone design, fully banded in I think it was 34 hours for what its worth. And no...I do not have or use dedicated jigs.

My suggestion , unless you under the gun...thow your watch way, close the door to your shop and have a nice long talk with the wood. Both you and your build will be better off.


Blessings
the
Padma

_________________
.

Audiences and dispensations on Thursdays ~ by appointment only.



.


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 3:05 pm 
Offline
Old Growth Brazilian
Old Growth Brazilian

Joined: Tue Dec 28, 2004 1:56 am
Posts: 10707
Location: United States
I doen to 60 hours total construction and finish work figured by the hour. Keeping in mind I do my building in the evenings after my day job and Saterdays and some times Sundays it takes me typically 3 months couting cure time and set-up but weather can affect me pretty bad because I am in a very dry climate and when 80-100% rh weather rolls in I don't own a dehumidifier. this year my problem was not how long it took to do the build it was getting the time to build due to my day job gaah


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 3:12 pm 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Sat May 17, 2008 1:11 pm
Posts: 2390
Location: Spokane, Washington
First name: Pat
Last Name: Foster
Country: USA
Focus: Build
Working around my day job and family needs, I churn one out in precisely 2 to 6 months.

Pat

_________________
formerly known around here as burbank
_________________

http://www.patfosterguitars.com


Top
 Profile  
 
PostPosted: Fri Nov 06, 2009 5:06 pm 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Fri Mar 24, 2006 12:42 pm
Posts: 2360
Location: Windsor Ontario Canada
First name: Fred
Last Name: Tellier
City: Windsor
State: Ontario
Zip/Postal Code: N8T2C6
Country: Canada
Focus: Build
Status: Amateur
Last winter I built number 4 and 5 guitars in the time it took to build my 1st which was a kit. I did a rough log of number 4 and when completed there were roughly 120 hours into it, and I think that a lot of that was wasted thinking about what I was about to do. Every one I have built has been different thus needing outside molds and bending forms. I feel my efficiency is increasing and the mistakes are much fewer and easier to correct. At this spreed of building I am glad I don't do this for a living, I would be poor.

Fred

_________________
Fred Tellier
http://www.fetellierguitars.com
Facebook page http://www.facebook.com/pages/FE-Tellier-Guitars/163451547003866


Top
 Profile  
 
PostPosted: Sat Nov 07, 2009 8:20 am 
Offline
Brazilian Rosewood
Brazilian Rosewood

Joined: Wed Apr 08, 2009 9:34 am
Posts: 3081
I don't "churn" anything out, but since my bread and butter is mandolins, it takes about 250 hours to churn out an F5. I would guess my guitars are taking 120-150 hours working part time.


Top
 Profile  
 
PostPosted: Sat Nov 07, 2009 11:27 am 
Offline
Brazilian Rosewood
Brazilian Rosewood
User avatar

Joined: Tue May 02, 2006 9:02 am
Posts: 2351
Location: Canada
First name: Bob
Last Name: Garrish
City: Toronto
State: Ontario
Country: Canada
Status: Professional
I know of two VERY respected acoustic builders (pros, of course) who are right around the 30 hour mark, and one I know is at 35 or less on an 'everything' model. A combination of really solid coordination and good jigs can change everything.

I'll let you know when I start building again soon; I hope to have a reasonably low time given the Fadal and it's wonderful jig-making ability. I think the first one'll be a bit slow, though, since I want to make one of those Taylor-style automatic side benders first (which may or may not be more exciting than the guitar :) )

_________________
Bob Garrish
Former Canonized Purveyor of Fine CNC Luthier Services


Top
 Profile  
 
PostPosted: Sat Nov 07, 2009 5:03 pm 
Offline
Brazilian Rosewood
Brazilian Rosewood

Joined: Thu Feb 12, 2009 10:27 pm
Posts: 2109
Location: South Carolina
First name: John
Last Name: Cox
Focus: Build
Status: Amateur
I think before you post, you gotta decide how you count "Building time"

Many folks count the total time between when they start and when they finish at so many hours per day...

The truth is that the actual time is far less than that -- you gotta eat, smoke, go to the bathroom, wait for paint and glue to dry, etc.

Consider How Long it really takes to do the bindings... Most folks would say it takes a couple days.... so they will list some absurd number like 72 hours (3-days).. or even 24 hours (3 days of 8-hr days)

But...
Setup the router 10 min
Cut the slots 5 min
Glue in 1st binding strip 20 min.
Glue in 2nd binding strip 20 min.
Wait for glue to dry 1 day...

So.. The reality is, the bindings maybe take a total of 2-hours... probably less.... but the time in days is Glue 1st pair... wait a day for glue to dry... Glue in 2nd pair... wait a day for glue to dry... etc.... 3 or 4 days go by...

Much of the building goes like this.. there is a whole lot of time spent in thinking about a job and waiting for glue to dry... but not much hands on working time.

This is why folks can build 3 guitars at the same time and it still takes the same amount of time to make those 3 as to do 1...

Thanks

John


Top
 Profile  
 
PostPosted: Sat Nov 07, 2009 9:00 pm 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Sat Nov 26, 2005 7:32 pm
Posts: 1969
Location: United States
Do you count actual building time only?

What about -
- the time it takes you to separate your fingers that you super glued together?
- emergency room visits for stitches and stitch removal?
- if you have to make another neck, do you subtract the time for the first two? gaah
- time on the OLF?
- etc.....

_________________
"An adventure is only an inconvenience rightly considered. An inconvenience is an adventure wrongly considered." G. K. Chesterton.


Top
 Profile  
 
PostPosted: Sat Nov 07, 2009 9:39 pm 
Offline
Cocobolo
Cocobolo
User avatar

Joined: Wed Jan 14, 2009 10:11 pm
Posts: 352
Location: muncie IN
First name: shad
Last Name: peters
Focus: Build
Steve Saville wrote:
Do you count actual building time only?

What about -
- the time it takes you to separate your fingers that you super glued together?
- emergency room visits for stitches and stitch removal?
- if you have to make another neck, do you subtract the time for the first two? gaah
- time on the OLF?
- etc.....


well i suppose all that has to be taken into consideration, but like i said im not really counting on exact numbers or anything, i was just kinda curious how other builders do compared to eachother and myself. it just seemed like an interesting topic of conversation.

for me i think the question would be do you count the time driving back and forth between the shop and the hardware store. that turns an 8 hour day into a 4 hour day pretty quick

_________________
~shad peters

http://www.flickr.com/photos/petersinstruments/
http://petersinstruments.blogspot.com/
http://petersinstruments.com/


Top
 Profile  
 
PostPosted: Sat Nov 07, 2009 10:10 pm 
Offline
Brazilian Rosewood
Brazilian Rosewood
User avatar

Joined: Tue May 02, 2006 9:02 am
Posts: 2351
Location: Canada
First name: Bob
Last Name: Garrish
City: Toronto
State: Ontario
Country: Canada
Status: Professional
Steve Saville wrote:
Do you count actual building time only?

What about -
- the time it takes you to separate your fingers that you super glued together?
- emergency room visits for stitches and stitch removal?


You'll save the second part of that time if you use acetone to separate them instead of a chisel :)

_________________
Bob Garrish
Former Canonized Purveyor of Fine CNC Luthier Services


Top
 Profile  
 
PostPosted: Sun Nov 08, 2009 4:26 am 
Offline
Koa
Koa

Joined: Sat Jun 17, 2006 8:29 am
Posts: 960
Location: Northern Ireland
First name: Martin
Last Name: Edwards
Focus: Build
Status: Amateur
I made this electric mando in 4 days

part time

after work etc.

realisticly, there's about 6 hours work in this.

Image

I built my latest bass in a month part time

more work here, maybe 25 hours?

Image

acoustics take a LOT longer!!

_________________
My soundclick xx luthier blog xx luthier soundclick


Top
 Profile  
 
PostPosted: Sun Nov 08, 2009 4:53 am 
Offline
Brazilian Rosewood
Brazilian Rosewood

Joined: Wed Jan 05, 2005 6:25 pm
Posts: 2749
Location: Netherlands
I 'budget' about 150 hours of build time for an acoustic with a fair amount of inlay/detailing. Getting shorter all the time; I'll try to log the hours on the next build. Electrics are faster, usually, although it kinda depends on how off the wall I'm being in terms of design and the like.


Top
 Profile  
 
PostPosted: Sun Nov 08, 2009 11:59 am 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Tue Jan 04, 2005 10:03 am
Posts: 6680
Location: Abbotsford, BC Canada
Any where from 1 month to 3.5 years :?

_________________
My Facebook Guitar Page

"There's really no wrong way, as long as the results are what's desired." Charles Fox

"We have to constantly remind ourselves what we're doing....No Luthier is putting a man on the moon!" Harry Fleishman

"Generosity is always different in the eye of the person who didn't receive anything, but who wanted some." Waddy Thomson


Top
 Profile  
 
PostPosted: Sun Nov 08, 2009 12:36 pm 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Mon Jul 27, 2009 7:52 am
Posts: 4524
First name: Big
Last Name: Jim
State: Deep in the heart of Bluegrass
Country: usa
Focus: Build
Status: Amateur
My first mando was between 40-50 hrs , of work and beer drinking Eat Drink


You do not have the required permissions to view the files attached to this post.

_________________
The Shallower the depth of the stream , The Louder the Babble !
The Taking Of Offense Is the Life Course Of The Stupid One !
Wanna Leave a Better Planet for our Kids? How about Working on BETTER KIDS for our Planet !
Forgiveness is the ability to accept an apology that you will probably NEVER GET
The truth will set you free , But FIRST, it will probably Piss you Off !
Creativity is allowing yourself to make Mistakes, Art is knowing which ones to Keep !
The Saddest thing anyone can do , is push a Loyal Person to the point that they Dont Care Anymore
Never met a STRONG person who had an EASY past !
http://wiksnwudwerks.blogspot.com/
http://www.facebook.com/groups/GatewayA ... rAssembly/


Top
 Profile  
 
PostPosted: Mon Nov 09, 2009 9:05 pm 
Offline
Contributing Member
Contributing Member
User avatar

Joined: Fri Aug 26, 2005 5:49 pm
Posts: 2915
Location: Norway
I remember reading in "the History Of Ovation" that they had 18 man hours hands on building time in the 70's. According to the book they were considering buying Martin at the time, but one thing that puzzled them was that they (Martin) only used 14 hours, despite their "primitive building techniques with clothes pins and plywood templates".

I build and repair guitars and mandolins full time now, but I don't expect to make more than 10-15 guitars this year. I guess I should get my act together and speed up!

_________________
Rian Gitar og Mandolin


Top
 Profile  
 
PostPosted: Tue Nov 10, 2009 12:34 am 
Offline
Koa
Koa
User avatar

Joined: Wed Jan 30, 2008 11:16 pm
Posts: 718
If you have all the parts thicknessed and cut, and molds done, its just a matter of putting them together, after the first one or 2. I bent 2 more side sets as I rebent tweeked my current set. Took 2 days stretched over a week, but boom, 2 side sets done! Now I have 3 guitar side sets, those are ready to get kerflining and neck/healblocks,2 next back and front sets are in the humidity bags. That was fast. Still have to glue up and thin the sets, headblocks etc, but I know what to expect, but there are 2 of those, and Ive already made alot of mistakes on the first set that I wont make on these 2 sets. Should go quick.

I could sand the headblocks to match, when Im not doing anything else, making duplicates is easy because its already set up.

So the first guitar is a struggle, mistakes still at every move, but the next 2 should take (2-3, so 6-7 months) of given energy/time.

Now, if I just had 2 more molds, I can make those from $2.00 scrap plywood I saw at Home depo... :twisted:

_________________
Here is what a Parlor Guitar is for!
http://www.youtube.com/watch?v=oEa8PkjO6_I


Top
 Profile  
 
PostPosted: Tue Nov 10, 2009 2:32 pm 
Offline
Walnut
Walnut

Joined: Fri Aug 15, 2008 10:54 am
Posts: 28
Location: Colorado
First name: Gabriel
Last Name: Chiroux
Focus: Build
Status: Semi-pro
you can build a guitar in a week.
however if you dont own a $1000 UV finishing set up, your looking a minimum of 2 weeks for the finish to dry enough to buff.

_________________
Bring me a sane man, and I will cure him.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 23 posts ] 

All times are UTC - 5 hours


Who is online

Users browsing this forum: guitarjtb and 39 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
Powered by phpBB® Forum Software © phpBB Group
phpBB customization services by 2by2host.com